The City of Bristol is scheduled to start Phase 1 of its annual roadway crack sealing program beginning Monday, Sept. 15.
As part of the program the following streets are anticipated to be crack sealed:
Delmar Drive
Maiden Lane
Country Lane
Boulder Drive
Carriage Road
Fleetwood Road
Woodchuck Lane
Old Farm Road
Beechwood Lane
Dogwood Lane
Driftwood Road
Brentwood Drive
Purdue Road
Michigan Ave
Northwestern Drive
Council Ring Drive
Climbing Street
Fairway View Drive
Ivy Drive
Sims Road
Marcia Drive (Ivy Drive to Cul-de-sac)
Kimberly Lane
Couture Drive
Alice Terrace
Rambler Street
Deerfield Road
Arbor Court
Edrow Road
Loveland Lane
Valmore Road
Cedar Street
Leominister Road
Westminister Road
Page Avenue
Moody Street
Mercier Avenue
Hoover Avenue
Louisianna Avenue
Lynn Road
Vantana Drive
Manross Road
Douglass Road
Rudolph Road
Rudolph Place
Sunset Drive
Colonial Road
Meadowbrook Drive
Hardwick Road
Westwood Road
Skyview Terrace
Norwood Road
Eastwood Road
Partridge Run
Some streets may be added or deleted depending upon the actual quantity of crack sealing material used. Work will be completed in approximately 30 days.
There may be minor traffic delays during construction, however the road will remain open for mail delivery, emergency vehicles, and local traffic at all times. Temporary “No Parking” signs will be posted as needed during construction.
If you should have questions or concerns about this project, please feel free to contact Public Works (860) 584-6297.