Quantcast
Channel: News – The Observers
Viewing all articles
Browse latest Browse all 5590

Crack sealing of select city roads begins Monday

$
0
0

The City of Bristol is scheduled to start Phase 1 of its annual roadway crack sealing program beginning Monday, Sept. 15.

As part of the program the following streets are anticipated to be crack sealed:

Delmar Drive

Maiden Lane

Country Lane

Boulder Drive

Carriage Road

Fleetwood Road

Woodchuck Lane

Old Farm Road

Beechwood Lane

Dogwood Lane

Driftwood Road

Brentwood Drive

Purdue Road

Michigan Ave

Northwestern Drive

Council Ring Drive

Climbing Street

Fairway View Drive

Ivy Drive

Sims Road

Marcia Drive (Ivy Drive to Cul-de-sac)

Kimberly Lane

Couture Drive

Alice Terrace

Rambler Street

Deerfield Road

Arbor Court

Edrow Road

Loveland Lane

Valmore Road

Cedar Street

Leominister Road

Westminister Road

Page Avenue

Moody Street

Mercier Avenue

Hoover Avenue

Louisianna Avenue

Lynn Road

Vantana Drive

Manross Road

Douglass Road

Rudolph Road

Rudolph Place

Sunset Drive

Colonial Road

Meadowbrook Drive

Hardwick Road

Westwood Road

Skyview Terrace

Norwood Road

Eastwood Road

Partridge Run

 

Some streets may be added or deleted depending upon the actual quantity of crack sealing material used. Work will be completed in approximately 30 days.

There may be minor traffic delays during construction, however the road will remain open for mail delivery, emergency vehicles, and local traffic at all times. Temporary “No Parking” signs will be posted as needed during construction.

If you should have questions or concerns about this project, please feel free to contact Public Works (860) 584-6297.

 


Viewing all articles
Browse latest Browse all 5590

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>